Gallery

Page 1 2 3 4 5 6 7 8 9


 

The start.

The day after Thanksgiving progress went into high gear, meetings had been held and projects were assigned and the team got on the throttle. Wow, a lot of work out of 5-6 guys in one day.
   

The doors were welded on. Jim had to grind out all of the welds.

Greg and Stan removing the cab.

   

Cab on the trailer, ready for dry strip.

Total Frame strip.